Bedroom addition, full reroof and resideRoof and siding on the whole house. Finished April 2026.
Full new roof. Full reside.
We built the bedroom addition, then put a new shingle roof and siding on the whole house.
The build, in order.
The addition from its block foundation to the frame and the roof, ahead of the full house reroof.
Foundation The block walls up against the back of the house, before the framing. April The addition all framed and sheathed in ZIP System panels. April Underlayment on the roof, ahead of the full house reroof.
The house we built it on.
A full new shingle roof and siding, all new soffit and fascia, every window boxed and wrapped, new 5-inch gutters, and the front porch beam wrapped in composite 1x.
From the road, with the front porch. The addition, on its block foundation. The back of the house and the steps up to the door. The new shingle roof on both levels, from the side.
What went into it.
- Addition
- A bedroom, framed and roofed
- Sheathing
- ZIP System panels
- Roof
- A full new shingle roof on the whole house
- Siding
- The whole house resided
- Soffit and fascia
- All new
- Windows
- Every window boxed and wrapped
- Gutters
- New 5-inch gutters
- Porch
- The front porch beam wrapped in composite 1x
- Built
- Finished in April 2026
One Contractor. Full Scope.
Decks, patios and porches are our thing, but we do a lot more than that.
- 2,800sq ft
Keystone Estate, Mt Pleasant
A full teardown and rebuild for commercial use: 46 footers, eight helical posts 14 to 21 feet deep at the lake edge, over 600 lags in the beams, and a clear 1,700 square feet for gatherings.
- 55square
Onyx Black roof and exterior
55 square of Owens Corning Onyx Black, Velux skylights, 400 feet of black soffit and fascia, and Provia stone where the siding was.
Open kitchen, wall removed
We took out the wall between the kitchen and dining room. All-wood cabinets, granite counters and a full stone backsplash.
Honest Timelines. No Runaround.
Decks and exterior work run spring through fall. Kitchens, baths, basements and flooring run January to April.
Tell us the job and add a few photos. Ben calls back with a time to walk it.
Get on the scheduleCall or text (412) 430-4774
Ben KissellBuilt Right. Done Right. The First Time.