Open kitchen, wall removedKitchen and dining, one room. Finished May 2026.
Kitchen remodel complete.
We took out the wall between the kitchen and dining room and remodeled the kitchen in all-wood cabinets and granite.
All-wood construction cabinets.
Granite on the counters and the peninsula, with a full stone backsplash up to the cabinets.
Before, with oak cabinets and white counters. Before, the wall from the dining side. From the dining side, with the wall gone. The granite peninsula, with three stools. The kitchen from the door, sink to fridge.
What went into it.
- Job
- A kitchen remodel
- Wall
- Out, between the kitchen and the dining room
- Cabinets
- All-wood construction
- Counters
- Granite, peninsula included
- Backsplash
- Full stone
- Built
- Finished in May 2026
Another kitchen remodel, in the owner's words.
"Ben kept us in the driver's seat throughout the entire project."
Staci O., Google, May 2026
One Contractor. Full Scope.
Decks, patios and porches are our thing, but we do a lot more than that.
- 2,800sq ft
Keystone Estate, Mt Pleasant
A full teardown and rebuild for commercial use: 46 footers, eight helical posts 14 to 21 feet deep at the lake edge, over 600 lags in the beams, and a clear 1,700 square feet for gatherings.
Cottage rebuilt, frame to finish
The owners' cottage had sentimental value, so we rebuilt it frame to finish: wood ceiling, stone fireplace, a new kitchen and baths.
- 55square
Onyx Black roof and exterior
55 square of Owens Corning Onyx Black, Velux skylights, 400 feet of black soffit and fascia, and Provia stone where the siding was.
Honest Timelines. No Runaround.
Decks and exterior work run spring through fall. Kitchens, baths, basements and flooring run January to April.
Tell us the job and add a few photos. Ben calls back with a time to walk it.
Get on the scheduleCall or text (412) 430-4774
Ben KissellBuilt Right. Done Right. The First Time.