Onyx Black Roof and Exterior | Kissell Home Designs Skip to main content
The finished house from the front lawn, with the new black roof and black fascia over the stone front bay

Onyx Black roof and exterior55 square. Finished September 2025.

Now here's a trans­formation.

We put a new Onyx Black roof on the house and set Provia stone where the siding once was.

Get on the scheduleor call (412) 430-4774

Stone where the siding once was.

Owens Corning Onyx Black shingles, Velux skylights, more than 400 feet of black soffit and fascia, 6-inch gutters with leaf guards, and the brick stained on the entire house.

  • Before, with gray siding on the bay.
  • The bay in Provia stone, under the new black fascia.
  • The front entry, with stone on both sides of the door.
  • The garage, in the stained brick.
  • The new roof from above, with a skylight.

What went into it.

Roof
55 square of Owens Corning Onyx Black
Skylights
New Velux skylights
Soffit and fascia
More than 400 feet, in black
Gutters
New 6-inch gutters with leaf guards
Stone
Provia stone where the siding once was
Brick
Stained on the entire house
Built
Finished in September 2025

Siding and gutters on another house, in the owner's words.

"We have used Kissell Home Designs for so many projects on our home- doors, floors, tiling, siding and gutters- and have been happy with every outcome. Ben is knowledgeable and hardworking."

Stephanie F. V., Facebook

One Contractor. Full Scope.

Decks, patios and porches are our thing, but we do a lot more than that.

  • 2,800sq ft

    Keystone Estate, Mt Pleasant

    A full teardown and rebuild for commercial use: 46 footers, eight helical posts 14 to 21 feet deep at the lake edge, over 600 lags in the beams, and a clear 1,700 square feet for gatherings.

  • Bedroom addition, full reroof and reside

    We framed and roofed the addition, then gave the whole house a new shingle roof, siding, soffit, fascia, wrapped windows and 5-inch gutters.

  • Open kitchen, wall removed

    We took out the wall between the kitchen and dining room. All-wood cabinets, granite counters and a full stone backsplash.

Every job, by category

Honest Timelines. No Runaround.

Decks and exterior work run spring through fall. Kitchens, baths, basements and flooring run January to April.

Tell us the job and add a few photos. Ben calls back with a time to walk it.

Get on the scheduleCall or text (412) 430-4774

Ben KissellBuilt Right. Done Right. The First Time.