Keystone Estate, Mt Pleasant2,800 sq ft deck. Finished August 2026.
The largest deck we have built.
A full teardown and rebuild for commercial use, with a clear 1,700 square feet for gatherings.
The Keystone build, in order.
We set the footers for the event-space additions in March. In June we tore out the old 3,000 square foot deck, five dumpsters of it, and by the end of August we had built 2,800 square feet back on 46 footers and eight helical posts.

Footers for the event space
Footers in and set for the additions to the event space.

The old deck comes out
Demo on a 3,000 square foot deck: nearly gone, five 30-yard dumpsters later.

Flashing and sill plates
This is why you install ledger flashing and pressure-treated sill plates. Next, 54 footers to drill.

46 footers, 8 helical posts
We had every post and beam set by July 4: helical posts 14 to 21 feet deep at the lake edge, and over 600 lags in the beams.

Taking shape
Joists down the length of the lodge.

Now it shows its size
The whole frame, seen from across the lake.

All the decking is on
TimberTech PVC across the open floor.

Before the railing
The lake from the new deck, before any railing went on.

Railing and a cocktail rail
TimberTech dark bronze aluminum, 42 inches high, with a cocktail rail along the top.

2,800 square feet, done
Everything is designed for a 100 lb per square foot working load.
The crew put in long days and a crunch at the end to finish it.
Ready for her maiden voyage.
TimberTech PVC decking, dark bronze aluminum railing at 42 inches, and a cocktail rail along the top.
The stairs from the drive From the lawn Along the lodge The open floor
What went into it.
Drag a box across the photo, or click a spot. On a phone, tap.
- Cocktail rail. A deck-top cocktail rail along the view side, so the railing is also the bar.
- 42-inch guard rail. TimberTech dark bronze aluminum, 42 inches high for commercial use.
- The stair. A wide run up from the drive, matched to the deck boards.
- 600 lags. More than 600 lag bolts through the beams, on posts set on 46 footers.
- Flashed at the ledger. The stone wall was stripped back to the ledger line and flashed before a board went on.
- Eight helical posts. Driven 14 to 21 feet deep at the lake edge, where a footer would not hold.
- 2,800 square feet. The old 3,000 came out in five dumpsters; the new deck keeps a clear 1,700 for gatherings.
- Load
- Designed for 100 lb per square foot
- Decking
- TimberTech PVC
- Event space
- Footers for the additions
- Built
- March to August 2026
One Contractor. Full Scope.
Decks, patios and porches are our thing, but we do a lot more than that.
- 45 x 16PVC
TimberTech deck with a cathedral roof
Vintage collection PVC, RDI clay vinyl railing, a 19 x 16 open gable roof with the beams wrapped in clay PVC trim.
Bedroom addition, full reroof and reside
We framed and roofed the addition, then gave the whole house a new shingle roof, siding, soffit, fascia, wrapped windows and 5-inch gutters.
- 55square
Onyx Black roof and exterior
55 square of Owens Corning Onyx Black, Velux skylights, 400 feet of black soffit and fascia, and Provia stone where the siding was.
Honest Timelines. No Runaround.
Decks and exterior work run spring through fall. Kitchens, baths, basements and flooring run January to April.
Tell us the job and add a few photos. Ben calls back with a time to walk it.
Get on the scheduleCall or text (412) 430-4774
Ben KissellBuilt Right. Done Right. The First Time.