Two commercial restroomsStalls and wall-hung sinks. Finished October 2024.
Commercial bathrooms.
We built two restrooms with marble-look tile and a run of stall partitions.
Charcoal stalls and marble-look tile.
Marble-look tile on the lower walls, and wall-hung sinks in pairs under framed mirrors.
A urinal beside two wall-hung sinks. The stall run at the end of the room, a hand dryer on the tile. Inside a stall, with grab bars on two walls. Two sinks on the left wall, the door at the far end.
What went into it.
- Job
- Two commercial restrooms
- Town
- Youngwood
- Walls
- Marble-look tile on the lower walls, painted above
- Floor
- Wood-look plank, with a floor drain
- Stalls
- Charcoal partitions, one stall with grab bars on two walls
- Sinks
- Wall-hung, in pairs under framed mirrors
- Fixtures
- A urinal, hand dryers, and soap and towel dispensers
- Built
- Finished in October 2024
One Contractor. Full Scope.
Decks, patios and porches are our thing, but we do a lot more than that.
- 2,800sq ft
Keystone Estate, Mt Pleasant
A full teardown and rebuild for commercial use: 46 footers, eight helical posts 14 to 21 feet deep at the lake edge, over 600 lags in the beams, and a clear 1,700 square feet for gatherings.
Open kitchen, wall removed
We took out the wall between the kitchen and dining room. All-wood cabinets, granite counters and a full stone backsplash.
Bedroom addition, full reroof and reside
We framed and roofed the addition, then gave the whole house a new shingle roof, siding, soffit, fascia, wrapped windows and 5-inch gutters.
Honest Timelines. No Runaround.
Decks and exterior work run spring through fall. Kitchens, baths, basements and flooring run January to April.
Tell us the job and add a few photos. Ben calls back with a time to walk it.
Get on the scheduleCall or text (412) 430-4774
Ben KissellBuilt Right. Done Right. The First Time.