Trex Hatteras Deck, Turned Stairs | Kissell Home Designs Skip to main content
The finished deck raised on posts behind the house, with black aluminum railing and a patio underneath

Trex Hatteras deck with turned stairs16 x 20 Trex deck. Finished May 2026.

Trex deck with turned stairs.

We turned windows into a sliding door and ran electric on and under the deck.

Get on the scheduleor call (412) 430-4774

Trex Lineage Hatteras decking.

Hatteras boards on the deck and the stairs, with black aluminum railing from the deck down to the yard.

  • Hatteras boards from the rail to the sliding door.
  • Down off the deck to the landing where the stairs turn.
  • The long run up to the deck, black rail on both sides.

What went into it.

Deck
16 x 20, in Trex Lineage Hatteras
Stairs
Turned at a landing, in the same boards
Railing
Black aluminum, on the deck and the stairs
Door
Windows turned into a sliding door
Electric
On the deck and under it
Built
Finished in May 2026

Another deck remodel, in the owner's words.

"I cannot say enough great things about Kissell Home Designs and the incredible job they did on our deck remodel. From start to finish, the process was smooth, professional, and completely exceeded our expectations."

Katie S., Facebook

One Contractor. Full Scope.

Decks, patios and porches are our thing, but we do a lot more than that.

  • 2,800sq ft

    Keystone Estate, Mt Pleasant

    A full teardown and rebuild for commercial use: 46 footers, eight helical posts 14 to 21 feet deep at the lake edge, over 600 lags in the beams, and a clear 1,700 square feet for gatherings.

  • Bedroom addition, full reroof and reside

    We framed and roofed the addition, then gave the whole house a new shingle roof, siding, soffit, fascia, wrapped windows and 5-inch gutters.

  • 55square

    Onyx Black roof and exterior

    55 square of Owens Corning Onyx Black, Velux skylights, 400 feet of black soffit and fascia, and Provia stone where the siding was.

Every job, by category

Honest Timelines. No Runaround.

Decks and exterior work run spring through fall. Kitchens, baths, basements and flooring run January to April.

Tell us the job and add a few photos. Ben calls back with a time to walk it.

Get on the scheduleCall or text (412) 430-4774

Ben KissellBuilt Right. Done Right. The First Time.