Two-Tone Kitchen, Downstairs Rebuilt | Kissell Home Designs Skip to main content
The finished kitchen: white shaker cabinets, a stained wood island under a black pendant light, a stainless fridge and a gray tile backsplash

Two-tone kitchen, moved across the houseWalls out, new beams in.

One open downstairs.

We moved the kitchen to the other side of the house and set new beams where the walls came out.

Get on the scheduleor call (412) 430-4774

Two-tone cabinets and a center island.

White shaker cabinets and a stained wood island, with a gray brick-pattern tile backsplash behind the white counters.

  • The whole kitchen, with tall cabinets beside the fridge.
  • The sink under the window and the range on the tile wall.
  • A microwave drawer built into the island.
  • Past the fridge and the tall cabinets to the sink window.

What went into it.

Job
The kitchen moved to the other side of the house, and the downstairs rebuilt around it
Walls
Out, on new beams, to open the downstairs into one space
Wiring
New, in both spaces
Insulation and drywall
New
Flooring
New, across the whole downstairs, the addition included
Trim
New baseboard and casing in every room the remodel reached
Cabinets
White shaker, with a stained wood center island

One Contractor. Full Scope.

Decks, patios and porches are our thing, but we do a lot more than that.

  • 2,800sq ft

    Keystone Estate, Mt Pleasant

    A full teardown and rebuild for commercial use: 46 footers, eight helical posts 14 to 21 feet deep at the lake edge, over 600 lags in the beams, and a clear 1,700 square feet for gatherings.

  • Cottage rebuilt, frame to finish

    The owners' cottage had sentimental value, so we rebuilt it frame to finish: wood ceiling, stone fireplace, a new kitchen and baths.

  • 55square

    Onyx Black roof and exterior

    55 square of Owens Corning Onyx Black, Velux skylights, 400 feet of black soffit and fascia, and Provia stone where the siding was.

Every job, by category

Honest Timelines. No Runaround.

Decks and exterior work run spring through fall. Kitchens, baths, basements and flooring run January to April.

Tell us the job and add a few photos. Ben calls back with a time to walk it.

Get on the scheduleCall or text (412) 430-4774

Ben KissellBuilt Right. Done Right. The First Time.