Hall bath overhaulDouble vanity, new tub and surround. Finished November 2025.
Complete hall bath overhaul.
We overhauled the whole hall bath, from a white double vanity to a new tub and surround.
A white double vanity and a new tub.
Beadboard wainscot under painted walls, and a wood-look plank floor from the door to the tub.
The double vanity, with the mirrored cabinet above. The new tub and surround, with a curved rod. From the door, a second, single vanity at the far end.
What went into it.
- Job
- A complete hall bath overhaul
- Vanity
- White, two sinks, under a mirrored cabinet
- Second vanity
- Single sink, under a three-light bar
- Walls
- Beadboard wainscot, painted above
- Tub
- New, in a white surround with a curved rod
- Floor
- Wood-look plank
- Built
- Finished in November 2025
One Contractor. Full Scope.
Decks, patios and porches are our thing, but we do a lot more than that.
- 2,800sq ft
Keystone Estate, Mt Pleasant
A full teardown and rebuild for commercial use: 46 footers, eight helical posts 14 to 21 feet deep at the lake edge, over 600 lags in the beams, and a clear 1,700 square feet for gatherings.
Open kitchen, wall removed
We took out the wall between the kitchen and dining room. All-wood cabinets, granite counters and a full stone backsplash.
Bedroom addition, full reroof and reside
We framed and roofed the addition, then gave the whole house a new shingle roof, siding, soffit, fascia, wrapped windows and 5-inch gutters.
Honest Timelines. No Runaround.
Decks and exterior work run spring through fall. Kitchens, baths, basements and flooring run January to April.
Tell us the job and add a few photos. Ben calls back with a time to walk it.
Get on the scheduleCall or text (412) 430-4774
Ben KissellBuilt Right. Done Right. The First Time.